| 1.1 |
Date updated: |
Mar 10, 2010 |
| 1.2 |
Vessel's name: |
Stx Ace10 |
| 1.3 |
IMO number: |
9443877 |
| 1.4 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
| 1.5 |
Date delivered: |
Mar 24, 2008 |
| 1.6 |
Builder (where built): |
STX Shipbuilding Co., Ltd |
| 1.7 |
Flag: |
Panama |
| 1.8 |
Port of Registry: |
PANAMA |
| 1.9 |
Call sign: |
3EPV8 |
| 1.10 |
Vessel's satcom phone number: |
764840960~2 |
| Vessel's fax number: |
764840963 |
| Vessel's telex number: |
Not Applicable |
| Vessel's email address: |
stxace10@networkship.com |
| 1.11 |
Type of vessel: |
Oil Tanker |
| 1.12 |
Type of hull: |
Double Hull |
| 1.13 |
Classification society: |
Korean Register |
| 1.14 |
Class notation: |
+KRS1-Oil/Chemical Tanker 'ESP'(FBC), (IWS) Product/II & III 2G/1.025 SG(IBC) + KRM1-UMA.STCM |
| 1.15 |
If Classification society changed, name of previous society: |
N/A |
| 1.16 |
If Classification society changed, date of change: |
Not Applicable |
| 1.17 |
IMO type, if applicable: |
|
| 1.18 |
Does the vessel have ice class? If yes, state what level: |
, |
| 1.19 |
Date / place of last dry-dock: |
Mar 24, 2008 |
|
| 1.20 |
Date next dry dock due |
Mar 23, 2013 |
| 1.21 |
Date of last special survey / next survey due: |
Mar 24, 2008 |
Mar 23, 2013 |
| 1.22 |
Date of last annual survey: |
May 15, 2009 |
| 1.23 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
|
| 1.24 |
Does the vessel have a statement of compliance issued under the provisions of the Condition Assessment Scheme (CAS): If yes, what is the expiry date? |
N/A |
| 1.25 |
Length Over All (LOA): |
183 M |
| 1.26 |
Length Between Perpendiculars (LBP): |
173.9 M |
| 1.27 |
Extreme breadth (Beam): |
32.229 M |
| 1.28 |
Moulded depth: |
19.1 M |
| 1.29 |
Keel to Masthead (KTM) / KTM in collapsed condition (if applicable): |
46.354 M |
M |
| 1.30 |
Bow to Center Manifold (BCM) / Stern to Center Manifold (SCM): |
92.34 M |
90.66 M |
| 1.31 |
Distance bridge front to center of manifold: |
55.76 M |
| 1.32 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
| Forward to mid-point manifold: |
24.925 M |
40.616 M |
40.616 M |
| Aft to mid-point manifold: |
30.962 M |
47.935 M |
56.379 M |
| Parallel body length: |
55.887 M |
88.551 M |
96.995 M |
| 1.33 |
FWA at summer draft / TPC immersion at summer draft: |
271 MM |
51.8 MT |
| 1.34 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
| Lightship: |
43.784 M |
0.000 M |
| Normal ballast: |
38.679 M |
0.000 M |
| At loaded summer deadweight: |
34.154 M |
0.000 M |
| 1.35 |
Net Tonnage: |
11735 |
| 1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
30027 |
|
| 1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
31579.65 |
27297.85 |
| 1.38 |
Panama Canal Net Tonnage (PCNT): |
24924 |
| 1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
| Summer: |
6.913 M |
12.2 M |
46159.5 MT |
56214.5 MT |
| Winter: |
7.167 M |
11.946 M |
44832.6 MT |
54879.6 MT |
| Tropical: |
6.659 M |
12.454 M |
47466.5 MT |
57531.5 MT |
| Lightship: |
16.543 M |
2.57 M |
|
10055 MT |
| Normal Ballast Condition: |
11.438 M |
7.675 M |
23341.1 MT |
33406.1 MT |
| 1.40 |
Does vessel have multiple SDWT? |
N/A |
| 1.41 |
If yes, what is the maximum assigned deadweight? |
MT |
| 1.42 |
Registered owner - Full style: |
POS MARITIME RX S.A 53 Street, Urbanization Obarrio, Swiss Tower 16th fl, PANAMA Republic of Panama Tel: VIA STX PANOCEAN CO. Fax: 82-2-316-5075 Telex: n/a |
| 1.43 |
Technical operator - Full style: |
STX POS SHIP MANAGEMENT CO. 17F, STX PAN OCEAN Bldg, 83-5, 4-Ga, Jungang-Dong, Jung-Ku, Busan, Korea, 600-725 Tel: 82-51-461-2136 Fax: 82-51-464-3558 Telex: Not Applicable Email: pslee@posship.com Company IMO#: 1739467 |
| 1.44 |
Commercial operator - Full style: |
STX Pan Ocean Co., Ltd STX Namsan Tower, 631, Namdaemunno 5-ga, Jung-gu, Seoul, Korea Tel: 82 2 316 5555 Fax: 82 2 316 5075 Telex: K23511 Email: shhan@stxpanocean.com |
| 1.45 |
Disponent owner - Full style: |
STX Pan Ocean Co., Ltd STX Namsan Tower, 631, Namdaemunno 5-ga, Jung-gu, Seoul, Korea Tel: 82 2 316 5547 Fax: 82 2 316 5075 Telex: K23511 Email: kwkwon@stxpanocean.com |
| |
| 2.1 |
Safety Equipment Certificate: |
Mar 24, 2008 |
May 15, 2009 |
Mar 23, 2013 |
| 2.2 |
Safety Radio Certificate: |
Mar 24, 2008 |
May 15, 2009 |
Mar 23, 2013 |
| 2.3 |
Safety Construction Certificate: |
Mar 24, 2008 |
May 15, 2009 |
Mar 23, 2013 |
| 2.4 |
Loadline Certificate: |
Mar 24, 2008 |
|
Mar 23, 2013 |
| 2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Mar 24, 2008 |
|
Mar 23, 2013 |
| 2.6 |
Safety Management Certificate (SMC): |
Aug 16, 2008 |
|
Aug 15, 2013 |
| 2.7 |
Document of Compliance (DOC): |
May 25, 2009 |
Not Applicable |
Jul 02, 2014 |
| 2.8 |
USCG (specify: COC, LOC or COI): COC |
Aug 31, 2008 |
Jul 21, 2009 |
Aug 31, 2010 |
| 2.9 |
Civil Liability Convention Certificate (CLC): |
Feb 20, 2010 |
|
Feb 20, 2011 |
| 2.10 |
Civil Liability for Bunker Oil Pollution Damage Convention Certificate (CLBC): |
Feb 20, 2010 |
|
Feb 20, 2011 |
| 2.11 |
U.S. Certificate of Financial Responsibility (COFR): |
Mar 26, 2008 |
|
Mar 26, 2011 |
| 2.12 |
Certificate of Fitness (Chemicals): |
Mar 15, 2009 |
May 15, 2009 |
Mar 23, 2013 |
| 2.13 |
Certificate of Fitness (Gas): |
Not Applicable |
|
Not Applicable |
| 2.14 |
Certificate of Class: |
Aug 18, 2008 |
May 15, 2009 |
Mar 23, 2013 |
| 2.15 |
International Ship Security Certificate (ISSC): |
Jan 21, 2009 |
|
Aug 17, 2013 |
| 2.16 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Mar 24, 2008 |
|
Mar 23, 2013 |
| 2.17 |
International Air Pollution Prevention Certificate (IAPP): |
Mar 24, 2008 |
|
Mar 23, 2013 |
| 2.18 |
Does vessel have all updated publications as listed in the Vessel Inspection Questionnaire, Chapter 2- Question 2.24, as applicable: |
|
| 2.19 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
| |
| 3.1 |
Nationality of Master: |
Korea |
| 3.2 |
Nationality of Officers: |
KOREA |
| 3.3 |
Nationality of Crew: |
KOREA & MYANMAR |
| 3.4 |
If Officers/Crew employed by a Manning Agency - Full style: |
Officers: STX POS SHIP MANAGEMENT CO., LTD 17F, STX PAN OCEAN bldg, 83-5, 4-ga, Jungang-Dong, Jung-Ku, Busan, Korea, 600-725 Tel: 82-51-461-2136 Fax: 82-51-461-2136 Telex: Not Applicable Email: pslee@poship.com Crew: STX POS SHIP MANAGEMENT CO., LTD 17F, STX PAN OCEAN bldg, 83-5, 4-ga, Jungang-Dong, Jung-Ku, Busan, Korea, 600-725 Tel: 82-51-461-2141 Fax: 82-51-461-2079 Telex: Not Applicable Email: pslee@posship.com |
| 3.5 |
What is the common working language onboard: |
ENGLISH |
| 3.6 |
Do officers speak and understand English: |
Yes |
| 3.7 |
In case of Flag Of Convenience, is the ITF Special Agreement on board: |
Yes |
| |
| 4.1 |
Can the ship comply with the ICS Helicopter Guidelines: |
Yes |
| 4.2 |
If Yes, state whether winching or landing area provided: |
Winching |
| |
| 5.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter: |
Yes |
| 5.2 |
Qualified individual (QI) - Full style: |
Gallagher Marine Systems, LLC 100 Century Parkway-Suite 130, Mount Laurel, New Jersey 08054 Tel: 1 856 642 2091 Fax: 1 856 642 3945 Email: info@chgms.com |
| 5.3 |
Oil Spill Response Organization (OSRO) -Full style: |
National Response Corp. 3500 Sunrise Highway Suite T103 Great River, NY 11739 Tel: 1 631 224 9141 Fax: 1 631 224 9082 |
| 5.4 |
Has technical operator signed the SCIA / C-TPAT agreement with US customs concerning drug smuggling: |
Yes |
| |
| 6.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks: |
|
| 6.2 |
If Yes, is bulkhead solid or perforated: |
Solid |
| 6.3 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
|
| 6.4 |
Total cubic capacity (98%, excluding slop tanks): |
52196.9 M3 |
| 6.5 |
Slop tank(s) capacity (98%): |
1380.47 M3 |
| 6.6 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
M3 |
| 6.7 |
Does vessel have Segregated Ballast Tanks (SBT) or Clean Ballast Tanks (CBT): |
SBT |
| 6.8 |
What is total capacity of SBT? |
24424.6 M3 |
| 6.9 |
What percentage of SDWT can vessel maintain with SBT only: |
54 % |
| 6.10 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: (previously Reg 13.2) |
Yes |
| 6.11 |
How many grades/products can vessel load/discharge with double valve segregation: |
6 |
| 6.12 |
Maximum loading rate for homogenous cargo per manifold connection: |
3600 M3/HR |
| 6.13 |
Maximum loading rate for homogenous cargo loaded simultaneously through all manifolds: |
4440 M3/HR |
| 6.14 |
Are there any cargo tank filling restrictions. If yes, please specify: |
Not Applicable |
| 6.15 |
Pumps: |
No. |
Type |
Capacity |
| Cargo: |
12 2 1 1 |
Centrifugal Centrifugal Centrifugal Centrifugal |
600 M3/HR 300 M3/HR 150 M3/HR 100 M3/HR |
| Stripping: |
|
|
M3/HR |
| Eductors: |
|
|
M3/HR |
| Ballast: |
2 |
Centrifugal |
750 M3/HR |
| 6.16 |
How many cargo pumps can be run simultaneously at full capacity: |
|
| 6.17 |
Is ship fitted with a Cargo Control Room (CCR): |
Yes |
| 6.18 |
Can tank innage / ullage be read from the CCR: |
Yes |
| 6.19 |
Can ship operate under closed conditions in accordance with ISGOTT: |
Yes |
| 6.20 |
What type of fixed closed tank gauging system is fitted: |
Radar |
| 6.21 |
Are overfill (high-high) alarms fitted? If Yes, indicate whether to all tanks or partial: |
|
| 6.22 |
Is a vapor return system (VRS) fitted: |
Yes |
| 6.23 |
Number/size of VRS manifolds (per side): |
|
MM |
| 6.24 |
State what type of venting system is fitted: |
High Velocity P/V valve |
| 6.25 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment': |
Yes |
| 6.26 |
What is the number of cargo connections per side: |
6 |
| 6.27 |
What is the size of cargo connections: |
350 MM |
| 6.28 |
What is the material of the manifold: |
STAINLESS STEEL |
| 6.29 |
Distance between cargo manifold centers: |
2000 MM |
| 6.30 |
Distance ships rail to manifold: |
4430 MM |
| 6.31 |
Distance manifold to ships side: |
46000 MM |
| 6.32 |
Top of rail to center of manifold: |
1690 MM |
| 6.33 |
Distance main deck to center of manifold: |
2100 MM |
| 6.34 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.525 M |
9 M |
| 6.35 |
Number / size reducers: |
6 x 350/350mm (14/14") 6 x 350/250mm (14/10") 6 x 350/200mm (14/8") 1 x 300/200mm (12/8") 2 x 350/150mm (14/6") |
| 6.36 |
Is vessel fitted with a stern manifold: |
No |
| 6.37 |
If stern manifold fitted, state size: |
MM |
| 6.38 |
Type of cargo heating system? |
Heat Exchanger |
| 6.39 |
If fitted, are all tanks coiled? |
No |
| 6.40 |
If fitted, what is the material of the heating coils: |
Stainless Steel |
| 6.41 |
Maximum temperature cargo can be loaded/maintained: |
60.0 °C / 140.0 °F |
60 °C / 140 °F |
| 6.42 |
Are cargo, ballast and slop tanks coated? |
Coated |
Type |
To What Extent |
| Cargo tanks: |
Yes |
PHENOLIC EPOXY |
Whole Tank |
| Ballast tanks: |
Yes |
TAR FREE EPOXY |
Whole Tank |
| Slop tanks: |
Yes |
|
Whole Tank |
| 6.43 |
If fitted, what type of anodes are used: |
Not Applicable |
| |
| 7.1 |
Is an Inert Gas System (IGS) fitted: |
Yes |
| 7.2 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
|
| 7.3 |
Is a Crude Oil Washing (COW) installation fitted: |
Yes |
| |
| 8.1 |
Mooring wires (on drums) |
No. |
Diameter |
Material |
Length |
Breaking Strength |
| Forecastle: |
|
MM |
|
M |
MT |
| Main deck fwd: |
|
MM |
|
M |
MT |
| Main deck aft: |
|
MM |
|
M |
MT |
| Poop deck: |
|
MM |
|
M |
MT |
| 8.2 |
Wire tails |
No. |
Diameter |
Material |
Length |
Breaking Strength |
| Forecastle: |
|
MM |
|
M |
MT |
| Main deck fwd: |
|
MM |
|
M |
MT |
| Main deck aft: |
|
MM |
|
M |
MT |
| Poop deck: |
|
MM |
|
M |
MT |
| 8.3 |
Mooring ropes (on drums) |
No. |
Diameter |
Material |
Length |
Breaking Strength |
| Forecastle: |
4 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| Main deck fwd: |
2 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| Main deck aft: |
2 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| Poop deck: |
4 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| 8.4 |
Other mooring lines |
No. |
Diameter |
Material |
Length |
Breaking Strength |
| Forecastle: |
4 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| Main deck fwd: |
|
MM |
|
M |
MT |
| Main deck aft: |
|
MM |
|
M |
MT |
| Poop deck: |
4 |
64 MM |
TERAFLEX |
200 M |
81 MT |
| 8.5 |
Mooring winches |
No. |
# Drums |
Brake Capacity |
| Forecastle: |
2 |
Double Drums |
69 MT |
| Main deck fwd: |
1 |
Double Drums |
69 MT |
| Main deck aft: |
1 |
Double Drums |
69 MT |
| Poop deck: |
2 |
Double Drums |
69 MT |
| 8.6 |
Mooring bitts |
No. |
SWL |
| Forecastle: |
6 |
MT |
| Main deck fwd: |
6 |
MT |
| Main deck aft: |
5 |
MT |
| Poop deck: |
8 |
MT |
| 8.7 |
Closed chocks and/or fairleads of enclosed type |
No. |
SWL |
| Forecastle: |
3 |
MT |
| Main deck fwd: |
12 |
MT |
| Main deck aft: |
10 |
MT |
| Poop deck: |
7 |
MT |
| 8.8 |
Type / SWL of Emergency Towing system forward: |
KETA-45F |
200 MT |
| 8.9 |
Type / SWL of Emergency Towing system aft: |
KETA-20A |
100 MT |
| 8.10 |
Number of shackles on port cable: |
11 |
| 8.11 |
Number of shackles on starboard cable: |
11 |
| 8.12 |
What is SWL and size of closed chock and/or fairleads of enclosed type on stern: |
64 MT |
1500 X 650 |
| 8.13 |
What is SWL of bollard on poopdeck suitable for escort tug: |
64 MT |
| 8.14 |
What is brake horse power of bow thruster (if fitted): |
BHP |
0 KW |
| 8.15 |
What is brake horse power of stern thruster (if fitted): |
BHP |
0 KW |
| 8.16 |
Does vessel comply with the latest edition of OCIMF 'Recommendations for Equipment Employed in the Mooring of Vessels at Single Point Moorings (SPM)': |
Yes |
| 8.17 |
Is vessel fitted with chain stopper(s): |
Yes |
| 8.18 |
How many chain stopper(s) are fitted: |
1 |
| 8.19 |
State type of chain stopper(s) fitted: |
TONGUE TYPE |
| 8.20 |
Safe Working Load (SWL) of chain stopper(s): |
200 MT |
| 8.21 |
What is the maximum size chain diameter the bow stopper(s) can handle: |
76 MM |
| 8.22 |
Distance between the bow fairlead and chain stopper/bracket: |
5000 MM |
| 8.23 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes |
| 8.24 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10 Tonnes Centre |
| 8.25 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
8.8 M |
| 8.26 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum or Liquified Gas, as applicable): |
Yes |
| |
| 9.1 |
What type of fuel is used for main propulsion? |
H.F.O |
| 9.2 |
What type of fuel is used in the generating plant? |
H.F.O 380 CST & D.O |
| 9.3 |
Capacity of bunker tanks - IFO and MDO/MGO: |
1529.3 M3 |
197.1 M3 41.7 M3 |
| 9.4 |
Is vessel fitted with fixed or controllable pitch propeller(s)? |
Fixed Pitch |
| 9.5 |
P & I Club - Full Style: |
STANDARD CLUB |
| 9.6 |
P & I Club coverage - pollution liability coverage: |
1000000000 US$ |
| 9.7 |
Date and place of last Port State Control inspection: |
Jul 21, 2009 / New York, USA |
| 9.8 |
Any outstanding deficiencies as reported by any Port State Control: |
No |
| 9.9 |
If yes, provide details: |
N/A |
| 9.10 |
Has vessel been involved in a pollution, grounding, serious casualty or collision incident during the past 12 months? If yes, full description: |
Pollution: No , N/A Grounding: No , N/A Serious casualty: , Collision: No , N/A |
| 9.11 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
Contact owner for details |
| 9.12 |
Date/Place of last SIRE Inspection: |
Sep 10, 2009 / New York, USA |
| 9.13 |
Date/Place of last CDI Inspection: |
N/A |
| 9.14 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*Blanket "approvals" are no longer given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |